Location: Lanham-Seabrook , MD
GC/CM: Whiting-Turner
Completed: September 2017
Project Size: 343,000 square feet
Project Type: New Construction
Suburban Hospital Parking Garage
New construction of a 7 level parking garage. The 2nd floor of the garage is fit-out to be an emergency triage area in the event of a large-scale disaster in the area. This project included 3 elevators, a generator and a fire pump. There was extensive infrastructure work performed for low-voltage and power distribution between the existing hospital, garage and future hospital.